PROJECT EXPERIENCE
SPACE SYSTEMS ENGINEERING
The Boeing
Company – Boeing Satellite Development Center
The
Terraza Group Inc. is a performance oriented company. Nowhere
is this more evident than in the growth of our participation
with the Boeing Satellite Development Center. Eight years
ago we started an outsource pilot program with the Ground
Support Equipment Group. From that initial program we have
expanded our participation enormously. We are proud to have
grown into a well-respected member of the design team that
is regularly called upon to work critical path projects.
Mechanical Design of non-flight Satellite Ground Support
Equipment and producing Technical Documentation are the
two main products we supply. The work we do for Boeing is
proprietary, which precludes detailed descriptions of our
experience. We invite you to download our statement of qualifications
for additional information for each of the functional areas
we support.
CONSTRUCTION MANAGEMENT
DESIGN BUILD
Bond BB Program – Los Angeles
Unified School District
As
a major sub consultant to a Cluster Program Manager, The
Terraza Design Group provided expert technical support personnel
to the Bond BB program. The Los Angeles Unified School District’s
(LAUSD) Repair and Construction Bond program is one of the
largest school repair programs of its kind ever accomplished
in the United States. This program included repair and construction
activities at over 700 schools in Los Angeles. Our tasks
included the management of the implementation of technology
upgrades, replacement of plumbing, HVAC, electrical and
fire alarm systems, interior and exterior painting, and
a limited amount of new school construction. We were responsible
for all renovation projects in three of the four school
clusters in LAUSD Maintenance and Operation (M/O) Area Seven
(7). These three clusters contain a total of 100 schools.
The projects associated with these clusters have a construction
value in excess of $240 million and will result in the generation
of over 300 construction contracts.
INFORMATION TECHNOLOGY
Voice and Data Network
Chek Lap Kok Intl Airport
Hong Kong – HAS
Working
as a sub-contract consultant to Hughes Airport Systems,
Terraza provided system engineering support for the voice
and data network at Chek Lap Kok (CLK) International Airport
Hong Kong. The airport wide ATM network solution provides
high reliability and seamless integration of all airport
operational systems. The Terraza Design Group designed a
Host LAN for the Hong Kong Airport to provide the optimum
solution to meet the demanding requirements for interconnectivity.
The equipment consists of ATM switches, ATM-Ethernet Hubs
and routers provided by Cisco. Each suite of equipment has
its own firmware and software designed to achieve the most
efficiency and reliability from each unit. The Enterprise
Network Switch ATM fabric is based on a fully-interconnected,
midplane based architecture. Sixteen independent CellStreams
are available for hard assignment to individual user or
backbone ports. Each Cellstream provides 190 Mbps of usable
bandwidth, which can accommodate a standard interface supporting
155 Mbps of user traffic.
|
|